Five stages on a ground-up build
- Before the foundation is poured.Plumbing and electrical lines, trenches and forms. After the pour, they are under concrete.
- At framing.Lumber, connections, moisture or mold, and cuts where plumbing and wiring pass through.
- Before sheetrock.Outlets, insulation, plumbing, ducts and window flashing, while the walls are still open.
- Before closing.Roof, grading, HVAC, electrical, plumbing, appliances and finishes. Schedule it ahead of your final walk so there is time to fix things.
- At 11 months.Sticking doors, nail pops, drainage and cooling, before the first-year warranty usually ends.
Buying a finished home? The early stages are already covered up, so put your effort into a full inspection before closing and the 11-month visit.
Get it in the contract
- Your right to bring your own inspector, and when
- How many business days of notice you will get
- Who answers the repair list, and by when
- What happens if a repair is not done by closing
- The warranty terms, in writing, with the claim steps
Who to hire
Use an inspector licensed by the Texas Real Estate Commission who does new builds often. You choose the inspector. I can give you several names and you can check any license on the TREC site.
Common questions
Will the builder allow my inspector?
Most do, with scheduling rules. Ask before you sign and get the rule in writing.
The city inspects it. Why pay for another?
City inspections check code at set points. Your inspector works for you and spends more time on one home.
How much does it cost?
Prices vary by size and number of visits. Get two quotes and ask for a package price on the stages you want.
Let's talk about your next move.
Ask me anything. I will answer straight, explain your options and never push.